Home › Replace date variable during DO Job override
Replace date variable during DO Job override
Hello,
If we need to run a DO Job on a robot job but want to use a different date than we have in there, @@DATEYYMD, to 20091307 for example, is there a way to temporarily change it without changing it in the actual robot job? We use both the GUI and Green screens.
thank you,
Dwain
Login to post new content in forum or to comment on an existing forum post.




